DU CANE COURT

DU CANE COURT

Client: Dorrington PLC

Main Contractor: Calfordseadon

Summary of works:

Upgrading of the existing front entrance door sets to the required FD30 standard and communal door sets to the required standard for smoke control.

Description of works:
• The works carried out consist of the installation of concealed door closers, Ironmongery, all frame smoke seals.
• Internal trim removed, and frame adjusted, intumescent mastic added to frame perimeter, ensuring the gaps to perimeter of frame/leaf are 3mm (+/-1mm).
• Organising an appointments schedule with the main contractor to complete 4 door upgrades per day.
• Once door upgrades are compliant we can issue certification under BM Trada maintenance scheme.