CASE STUDIES
CASE STUDY 1: CHILTERN BUILDING
SECTOR: SOCIAL HOUSING
SERVICES: FIRE DOORS
Client: Mulalley
Main Contractor: Mulalley
Location: Southend-On-Sea, SS2
Contract Value: £600,000
Contract Duration: 8 weeks

Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded
CASE STUDY 2: DU CANE COURT
SECTOR: PRIVATE HOUSING
SERVICES: FIRE DOORS
Client: Dorrington PLC
Main Contractor: Calfordseadon
Location: Balham, SW17
Contract Value: £500,000
Contract Duration: 12 weeks

Read More
-
Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
-
Updated communal door sets to the required standard for smoke control
-
Installed concealed door closers, ironmongery and frame smoke seals
-
Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
-
Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
-
On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme
CASE STUDY 3: ST. GEORGE'S WHARF
SECTOR: COMMERCIAL OFFICES
SERVICES: FIRESTOPPING
Client: Berkeley Group
Main Contractor: Homepride Building Services
Location: Vauxhall, SW8
Contract Value: £7,000+
Contract Duration: 2 weeks
Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded
CASE STUDY 4: BLUE FINN BUILDING
SECTOR: COMMERCIAL OFFICES
SERVICES: SURVEYS & FIRESTOPPING
Client: Broadgate Estates
Location: Southwark, SE1
Contract Value: £6,000+
Contract Duration: 2 weeks
Read More
-
Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
-
Updated communal door sets to the required standard for smoke control
-
Installed concealed door closers, ironmongery and frame smoke seals
-
Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
-
Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
-
On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme

CASE STUDY 5: CROFTON INFANT & JUNIOR SCHOOLS
SECTOR: EDUCATION (PUBLIC)
SERVICES: FIRE DOORS
Client: Ridge & Partners LLP
Main Contractor: LFS
Location: Bromley, BR5
Contract Value: £315,000+
Contract Duration: 12 weeks
Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded
CASE STUDY 6: WEST MIDDLESEX HOSPITAL
SECTOR: HEALTHCARE
SERVICES: FIRE DOORS & FIRESTOPPING
Client: Chelsea & Westminster Hospital NHS Trust
Location: West Middlesex Hospital, Isleworth, TW7
Contract Value: £12,000+
Contract Duration: 4 days
Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded