CASE STUDIES
CASE STUDY 1: CHILTERN BUILDING
SECTOR: SOCIAL HOUSING
SERVICES: FIRE DOORS
​
Client: Mulalley
Main Contractor: Mulalley
Location: Southend-On-Sea, SS2
Contract Value: ÂŁ600,000
Contract Duration: 8 weeks

Read More
SUMMARY OF WORKS:
-
Compartmentation works to the restaurant area of the building
-
Fire stopping works to various penetrations
-
Installing unicollars around soil vent pipes (SVPs​)
CASE STUDY 2: DU CANE COURT
SECTOR: PRIVATE HOUSING
SERVICES: FIRE DOORS
​
Client: Dorrington PLC
Main Contractor: Calfordseadon
Location: Balham, SW17
Contract Value: ÂŁ500,000
Contract Duration: 12 weeks

Read More
-
Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
-
Updated communal door sets to the required standard for smoke control
-
Installed concealed door closers, ironmongery and frame smoke seals
-
Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
-
Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
-
On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme
CASE STUDY 3: ST. GEORGE'S WHARF
SECTOR: COMMERCIAL OFFICES
SERVICES: FIRESTOPPING
​
Client: Berkeley Group
Main Contractor: Homepride Building Services
Location: Vauxhall, SW8
Contract Value: ÂŁ7,000+
Contract Duration: 2 weeks
Read More
SUMMARY OF WORKS:
-
Compartmentation works to the restaurant area of the building
-
Fire stopping works to various penetrations
-
Installing unicollars around soil vent pipes (SVPs​)
CASE STUDY 4: BLUE FINN BUILDING
SECTOR: COMMERCIAL OFFICES
SERVICES: SURVEYS & FIRESTOPPING
​
Client: Broadgate Estates
Location: Southwark, SE1
Contract Value: ÂŁ6,000+
Contract Duration: 2 weeks​
Read More
-
Carried out a survey for compartmentalisation works needed in the ÂŁ415 million, 16 level floor-to-ceiling glazed building
-
Conducted a detailed, comprehensive fire stopping survey
-
Survey included a marked out floor plan of all the areas of where fire stopping work was needed and a detailed breakdown for each penetration highlighted
-
LFS carried out the works essential to the building, which included fire stopping over 1000 penetrations to compartmentalise the basement levels to the building

CASE STUDY 5: CROFTON INFANT & JUNIOR SCHOOLS
SECTOR: EDUCATION (PUBLIC)
SERVICES: FIRE DOORS
​
Client: Ridge & Partners LLP
Main Contractor: LFS
Location: Bromley, BR5
Contract Value: ÂŁ315,000+
Contract Duration: 12 weeks​
Read More
-
Carried out a survey for compartmentalisation works needed in the ÂŁ415 million, 16 level floor-to-ceiling glazed building
-
Conducted a detailed, comprehensive fire stopping survey
-
Survey included a marked out floor plan of all the areas of where fire stopping work was needed and a detailed breakdown for each penetration highlighted
-
LFS carried out the works essential to the building, which included fire stopping over 1000 penetrations to compartmentalise the basement levels to the building
CASE STUDY 6: WEST MIDDLESEX HOSPITAL
SECTOR: HEALTHCARE
SERVICES: FIRE DOORS & FIRESTOPPING
​
Client: Chelsea & Westminster Hospital NHS Trust
Location: West Middlesex Hospital, Isleworth, TW7
Contract Value: ÂŁ12,000+
Contract Duration: 4 days​
Read More
-
Carried out a survey for compartmentalisation works needed in the ÂŁ415 million, 16 level floor-to-ceiling glazed building
-
Conducted a detailed, comprehensive fire stopping survey
-
Survey included a marked out floor plan of all the areas of where fire stopping work was needed and a detailed breakdown for each penetration highlighted
-
LFS carried out the works essential to the building, which included fire stopping over 1000 penetrations to compartmentalise the basement levels to the building