CASE STUDIES 

CASE STUDY 1: CHILTERN BUILDING

 

SECTOR:  SOCIAL HOUSING

SERVICES:  FIRE DOORS

Client:  Mulalley

Main Contractor:  Mulalley

Location:  Southend-On-Sea, SS2

Contract Value:  £600,000

Contract Duration:  8 weeks

Read More


SUMMARY OF WORKS:

  • Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
  • Updated communal door sets to the required standard for smoke control
  • Installed concealed door closers, ironmongery and frame smoke seals
  • Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
  • Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
  • On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme





CASE STUDY 2: DU CANE COURT

 

SECTOR:  PRIVATE HOUSING

SERVICES:  FIRE DOORS

Client:  Dorrington PLC

Main Contractor:  Calfordseadon

Location:  Balham, SW17

Contract Value:  £500,000

Contract Duration:  12 weeks

Read More


SUMMARY OF WORKS:

  • Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
  • Updated communal door sets to the required standard for smoke control
  • Installed concealed door closers, ironmongery and frame smoke seals
  • Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
  • Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
  • On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme





CASE STUDY 3: ST. GEORGE'S WHARF

 

SECTOR:  COMMERCIAL OFFICES

SERVICES:  FIRESTOPPING

Client:  Berkeley Group

Main Contractor:  Homepride Building Services

Location:  Vauxhall, SW8

Contract Value:  £7,000+

Contract Duration:  2 weeks

Read More


SUMMARY OF WORKS:

  • Upgraded existing front entrance door sets (originally 1930's doors) to the required FD30 standard
  • Updated communal door sets to the required standard for smoke control
  • Installed concealed door closers, ironmongery and frame smoke seals
  • Internal trims removed, frames adjusted, intumescent mastic added to frame perimeter, ensuring gaps to perimeter of frame/leaf are 3mm (+/-1mm)
  • Planned an appointments schedule with the main contractor to complete 4 door upgrades per day
  • On completion of door upgrades to be compliant, LFS issued certification under BM Trada maintenance scheme





CASE STUDY 4: BLUE FINN BUILDING

 

SECTOR:  COMMERCIAL OFFICES

SERVICES:  SURVEYS & FIRESTOPPING

Client:  Broadgate Estates

Location:  Southwark, SE1

Contract Value:  £6,000+

Contract Duration:  2 weeks

Read More


SUMMARY OF WORKS: ​​

  • Carried out a survey for compartmentalisation works needed in the £415 million, 16 level floor-to-ceiling glazed building
  • Conducted a detailed, comprehensive fire stopping survey
  • Survey included a marked out floor plan of all the areas of where fire stopping work was needed and a detailed breakdown for each penetration highlighted
  • LFS carried out the works essential to the building, which included fire stopping over 1000 penetrations to compartmentalise the basement levels to the building





CASE STUDY 5: CROFTON INFANT &  JUNIOR SCHOOLS

 

SECTOR:  EDUCATION (PUBLIC)

SERVICES:  FIRE DOORS

Client:  Ridge & Partners LLP

Main Contractor:  LFS

Location:  Bromley, BR5

Contract Value:  £315,000+

Contract Duration:  12 weeks

Read More


SUMMARY OF WORKS: ​​

  • Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
  • Fire stopping across escape routes
  • Replaced over 125 single and double FD30 door sets
  • High level overhead glazing replaced
  • High level glazing boarded over to 30minutes resistance
  • Access entry system installed for main reception doors
  • Partition walls constructed to 1 hour fire resistance
  • 6 number doors upgraded





CASE STUDY 6: WEST MIDDLESEX HOSPITAL

 

SECTOR:  HEALTHCARE

SERVICES:  FIRE DOORS & FIRESTOPPING

Client:  Chelsea & Westminster Hospital NHS Trust

Location:  West Middlesex Hospital, Isleworth, TW7

Contract Value:  £12,000+

Contract Duration:  4 days

Read More


SUMMARY OF WORKS: ​​

  • Firestopping works to various services penetrations along corridors
  • Installed multiple sets of FD60 single and double door sets





 
 
 
 
 
 
BM Trada.png
certass.jpg
look-for-the-asfp-logo_edited.jpg
Exor Certificate of Accreditation, level
CHAS-Logo-png.png
FDIS.png
Fire Protection Association (FPA).jpg
SafeContractor-Logo.png
registered CCS.jpg
ConstructionLine-Gold.jpg
ASDMA-1-195x127.jpg
OUR TEAM

At LFS, all of our site team of engineers and trades carry a CSCS card, are DBS checked and First Aid trained. All of our subcontractors  are also required to meet the same Standards. 

OUR SERVICES
CONTACT US

t: 0207 237 0958

Unit 7, Glengall Business Centre, Glengall Road, London SE15 6NH

Map Directions

e: info@lfsfire.co.uk

Monday-Friday: 8:00 am - 5:00 pm
Saturday-Sunday: Closed

FOLLOW US
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter

© 2021 LFS. All Rights Reserved.

Website design by 

JLM Logo.png