CASE STUDIES
CASE STUDY 1: CHILTERN BUILDING
SECTOR: SOCIAL HOUSING
SERVICES: FIRE DOORS
​
Client: Mulalley
Main Contractor: Mulalley
Location: Southend-On-Sea, SS2
Contract Value: ÂŁ600,000
Contract Duration: 8 weeks

Read More
-
Installation of 140 front entrance doors plus communal fires screens and doors across 15 floors of 16-storey residential block -
Chiltern building is one of the tower blocks on the Queensway Estate in Southend-On-Sea which is benefiting from regeneration works.
CASE STUDY 2: DU CANE COURT
SECTOR: PRIVATE HOUSING
SERVICES: FIRE DOORS
​
Client: Dorrington PLC
Main Contractor: Calfordseadon
Location: Balham, SW17
Contract Value: ÂŁ500,000
Contract Duration: 12 weeks

Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded
CASE STUDY 3: ST. GEORGE'S WHARF
SECTOR: COMMERCIAL OFFICES
SERVICES: FIRESTOPPING
​
Client: Berkeley Group
Main Contractor: Homepride Building Services
Location: Vauxhall, SW8
Contract Value: ÂŁ7,000+
Contract Duration: 2 weeks
Read More
-
Installation of 140 front entrance doors plus communal fires screens and doors across 15 floors of 16-storey residential block -
Chiltern building is one of the tower blocks on the Queensway Estate in Southend-On-Sea which is benefiting from regeneration works.
CASE STUDY 4: BLUE FINN BUILDING
SECTOR: COMMERCIAL OFFICES
SERVICES: SURVEYS & FIRESTOPPING
​
Client: Broadgate Estates
Location: Southwark, SE1
Contract Value: ÂŁ6,000+
Contract Duration: 2 weeks​
Read More
-
Carried out a survey for compartmentalisation works needed in the ÂŁ415 million, 16 level floor-to-ceiling glazed building
-
Conducted a detailed, comprehensive fire stopping survey
-
Survey included a marked out floor plan of all the areas of where fire stopping work was needed and a detailed breakdown for each penetration highlighted
-
LFS carried out the works essential to the building, which included fire stopping over 1000 penetrations to compartmentalise the basement levels to the building

CASE STUDY 5: CROFTON INFANT & JUNIOR SCHOOLS
SECTOR: EDUCATION (PUBLIC)
SERVICES: FIRE DOORS
​
Client: Ridge & Partners LLP
Main Contractor: LFS
Location: Bromley, BR5
Contract Value: ÂŁ315,000+
Contract Duration: 12 weeks​
Read More
-
Time critical project with the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools
-
Fire stopping across escape routes
-
Replaced over 125 single and double FD30 door sets
-
High level overhead glazing replaced
-
High level glazing boarded over to 30minutes resistance
-
Access entry system installed for main reception doors
-
Partition walls constructed to 1 hour fire resistance
-
6 number doors upgraded
CASE STUDY 6: WEST MIDDLESEX HOSPITAL
SECTOR: HEALTHCARE
SERVICES: FIRE DOORS & FIRESTOPPING
​
Client: Chelsea & Westminster Hospital NHS Trust
Location: West Middlesex Hospital, Isleworth, TW7
Contract Value: ÂŁ12,000+
Contract Duration: 4 days​
Read More
-
Firestopping works to various services penetrations along corridors
-
Installed multiple sets of FD60 single and double door sets
